Example output · Construction Project Manager AI
What the Project Cost Estimator actually produces
Takes a project type, scope, location, and timeline and generates a structured cost estimate broken into trade-by-trade line items, material quantities with unit costs, and a crew-hour labor summary.
- Project Type:
- Commercial Office Renovation
- Scope:
- Full interior gut renovation of 3 floors (~18,000 sq ft): demolition, new MEP rough-in, drywall, flooring, drop ceilings, lighting, and finish carpentry.
- Location:
- Austin, TX
- Timeline:
- 7 months (April–October 2025)
COMMERCIAL OFFICE RENOVATION – AUSTIN, TX | 18,000 sq ft | 3 Floors COST SUMMARY BY TRADE: 1. DEMOLITION & SITE PREP: $54,000 - Full interior demolition, debris removal, hazmat survey (asbestos/lead assumed minimal) - 3 weeks, 6-person crew 2. STRUCTURAL/CONCRETE: $27,000 - Minor concrete patching, epoxy seal - 1 week, 2-person crew 3. MEP ROUGH-IN: $378,000 - Plumbing: $72,000 (restrooms, break areas) - HVAC: $180,000 (new ductwork, units, controls) - Electrical: $126,000 (panels, wiring, conduit) - 8 weeks, dedicated crews per trade 4. FRAMING/DRYWALL: $216,000 - Metal stud framing, drywall, tape & mud - 6 weeks, 8-person crew 5. FLOORING: $162,000 - Polished concrete (50%): $4.50/sq ft = $40,500 - LVT planks (40%): $6.50/sq ft = $46,800 - Carpet tile (10%): $5.00/sq ft = $9,000 - Underlayment, adhesive, labor - 3 weeks, 4-person crew 6. CEILING SYSTEMS: $54,000 - Suspended drop ceiling (80%), open plenum (20%) - Grid, tiles, paint - 2 weeks, 3-person crew 7. DOORS/FRAMES/HARDWARE: $81,000 - 45 interior doors @ $1,200 ea (frame, hardware, installation): $54,000 - Storefront glass/frames: $27,000 8. PAINTING: $45,000 - 18,000 sq ft @ $2.50/sq ft (walls, ceilings) - 3 weeks, 3-person crew 9. LIGHTING & ELECTRICAL FIXTURES: $108,000 - LED panels, recessed lights, fixtures, switches, outlets - 2.5 weeks, 4-person crew 10. MECHANICAL/PLUMBING FIXTURES: $72,000 - Restroom fixtures (toilets, sinks, faucets) - Kitchen fixtures, water coolers 11. FINISH CARPENTRY: $54,000 - Casework, shelving, trim, hardware - 3 weeks, 2-person crew 12. MISC (Fire suppression, signage, screens): $36,000 ————————————————— Subtotal Direct Costs: $1,287,000 GENERAL CONDITIONS (15%): $193,050 - Supervision, temporary utilities, staging, safety, permits CONTINGENCY (12%): $154,440 - Change orders, unforeseen conditions, minor scope adjustments PROFIT/OVERHEAD (8%): $102,960 TOTAL ESTIMATED PROJECT COST: $1,737,450 REGIONAL ADJUSTMENT: Austin labor rates run 5–8% below national average; estimate reflects local Austin 2025 pricing. ESTIMATED COST RANGE: $1,650,000 – $1,825,000 (±5% variance) TIMELINE RISK: 7-month schedule is achievable with concurrent MEP/framing phasing and experienced subcontractors. Weather impact minimal (indoor work); supply chain delays on custom millwork/fixtures flagged.
MATERIAL QUANTITIES & UNIT COSTS: DEMOLITION: - Debris removal: 450 cu yd @ $60/cu yd = $27,000 - Hazmat survey & minor abatement (allowance) = $4,500 - Dumpster rental (12 weeks) = $6,000 - Labor & equipment = $16,500 MEP MATERIALS: Electrical: - 200A service panel upgrade = $8,000 - Wire/conduit (est. 8,000 LF @ $2.50/LF) = $20,000 - Breakers, boxes, devices = $18,000 - LED fixtures (400 units @ $75 avg) = $30,000 - Miscellaneous = $8,000 Subtotal MEP materials: $210,000 FLOORING: - Polished concrete (9,000 sq ft) = $40,500 - LVT planks (7,200 sq ft @ $6.50/sq ft) = $46,800 - Carpet tile (1,800 sq ft @ $5.00/sq ft + pad) = $13,500 - Adhesive, primer, sealers = $8,500 DRYWALL & FRAMING: - Metal studs (est. 6,000 LF @ $1.20/LF) = $7,200 - Drywall (850 sheets @ $15/sheet) = $12,750 - Joint compound, tape, fasteners = $6,300 - Insulation (fiberglass batts) = $4,500 CEILING: - Suspension grid (14,400 sq ft @ $2.00/sq ft) = $28,800 - Drop tiles (12,000 sq ft @ $1.50/sq ft) = $18,000 DOORS & HARDWARE: - Interior prehung doors (45 @ $600 ea) = $27,000 - Storefront glass & framing = $18,000 - Hardware sets = $9,000 PAINT: - Paint & primer (18,000 sq ft @ $0.85/sq ft material) = $15,300 MISC FIXTURES & MATERIALS: - Restroom fixtures (toilets, sinks, faucets) = $24,000 - Countertops, casework materials = $18,000 - Fire suppression (allowance) = $12,000 TOTAL MATERIALS: ~$545,000 (42% of direct costs)
LABOR SUMMARY BY TRADE: DEMOLITION: 6-person crew × 3 weeks - Cost: $54,000 (includes equipment rental) MEP (CONCURRENT): - Electrical: 3-person crew × 8 weeks @ $85/hr = $102,000 - HVAC: 4-person crew × 8 weeks @ $90/hr = $144,000 - Plumbing: 2-person crew × 7 weeks @ $80/hr = $44,800 - Inspections & testing = $8,000 - MEP Subtotal: $298,800 FRAMING: 8-person crew × 6 weeks - 8 workers × 40 hrs/wk × 6 weeks @ $55/hr = $105,600 DRYWALL (TAPE & FINISH): - 4-person crew × 5 weeks @ $65/hr = $52,000 FLOORING: 4-person crew × 3 weeks - 4 workers × 40 hrs/wk × 3 weeks @ $60/hr = $28,800 CEILING: 3-person crew × 2 weeks - 3 workers × 40 hrs/wk × 2 weeks @ $55/hr = $13,200 DOORS & HARDWARE: 2-person crew × 2.5 weeks - 2 workers × 40 hrs/wk × 2.5 weeks @ $65/hr = $13,000 PAINTING: 3-person crew × 3 weeks - 3 workers × 40 hrs/wk × 3 weeks @ $50/hr = $18,000 LIGHTING & FIXTURE INSTALLATION: 4-person crew × 2.5 weeks - 4 workers × 40 hrs/wk × 2.5 weeks @ $75/hr = $30,000 PLUMBING FIXTURES & FINISH: 2-person crew × 2 weeks - 2 workers × 40 hrs/wk × 2 weeks @ $80/hr = $12,800 FINISH CARPENTRY: 2-person crew × 3 weeks - 2 workers × 40 hrs/wk × 3 weeks @ $65/hr = $15,600 TOTAL LABOR: ~$641,800 (50% of direct costs) SUPERVISION & PM (7 months): $40,000 KEY ASSUMPTIONS: - All labor rates include base wages + burden (taxes, insurance, benefits ~30%) - Austin market rates apply; no prevailing wage required - Crews assume experienced subcontractors; union labor premium not included - Schedule assumes minimal rework; quality inspections built into phase durations - No major change orders or schedule delays factored beyond 12% contingency
Swap in your actual project type, square footage, scope of work, city, and schedule. If your project has specific finish specs or known subcontractor rates, include those in the scope field to get tighter numbers.
Human review: Treat all figures as rough order-of-magnitude estimates only — verify unit costs against current local supplier quotes and subcontractor bids before submitting to an owner or bank.