Example output · Interior Designer AI
What the FF&E Specification Sheet Generator actually produces
Takes a project name, room type, item list, style direction, and budget tier, then generates a formatted FF&E schedule table with dimensions, materials, finishes, quantities, and estimated unit and total costs, plus sourcing notes with vendor tiers and lead times.
- Project Name:
- The Harlow Boutique Hotel – Guest Suite Renovation
- Room Space:
- Standard King Guest Room, ~380 sq ft
- Items:
- King bed frame, nightstands (2), upholstered lounge chair, writing desk, desk chair, floor lamp, blackout drapery, full-length mirror, mini-fridge cabinet
- Style:
- Contemporary Transitional with warm neutrals and brass accents
- Budget Tier:
- Mid-to-High (contract-grade, $15K–$22K per room)
# THE HARLOW BOUTIQUE HOTEL – STANDARD KING GUEST ROOM FF&E SCHEDULE ## Room: Standard King Guest Room (~380 sq ft) | Budget: $15K–$22K/room | Style: Contemporary Transitional --- ## FURNITURE | Item | Description | Dimensions | Material/Finish | Qty | Est. Price/Unit | Total | |------|-------------|------------|-----------------|-----|-----------------|-------| | **King Bed Frame** | Contemporary platform frame with low-profile metal base and upholstered headboard in performance fabric (greige). Integrated LED under-bed lighting optional. | 82"W × 87"D × 48"H (headboard) | Hardwood frame / upholstered headboard, brushed brass legs | 1 | $2,800–$3,500 | $2,800–$3,500 | | **Nightstand** | Floating or leg-based night table with single drawer and open shelf. Warm walnut veneer or light oak. Brushed brass hardware. | 28"W × 18"D × 26"H | Engineered wood veneer / brass handles | 2 | $650–$900 | $1,300–$1,800 | | **Upholstered Lounge Chair** | Mid-century modern silhouette. High-performance fabric in warm taupe or oat. Curved arms, track arms or wingback option. Brass nailhead trim optional. | 32"W × 38"D × 35"H | Hardwood frame / performance upholstery, brass nailheads | 1 | $1,400–$1,900 | $1,400–$1,900 | | **Writing Desk** | Clean-lined desk with single pedestal or trestle base. Top in walnut veneer or white oak. Cable management cutouts. Brass accents on pulls/legs. | 48"W × 24"D × 30"H | Engineered wood veneer, metal frame / brushed brass | 1 | $1,100–$1,500 | $1,100–$1,500 | | **Desk Chair** | Upholstered office chair in neutral fabric. Mid-back, 5-star base with casters. Brass-finish base or polished aluminum. Lumbar support standard. | 26"W × 26"D × 34"H (seat height 18–20") | Performance fabric / brushed brass or aluminum base | 1 | $550–$800 | $550–$800 | | **Mini-Fridge Cabinet** | Furniture-grade enclosure integrating mini-fridge (3.5–4 cu ft). Walnut veneer or white oak finish to match nightstands. Conceals appliance with soft-close door. | 36"W × 20"D × 32"H | Engineered wood veneer, integrated fridge, brass hardware | 1 | $1,200–$1,600 | $1,200–$1,600 | | **Full-Length Mirror** | Lean-to or wall-mounted mirror with brass or brushed gold frame. Beveled edge. Positioned near lounge area or entry. | 30"W × 72"H (or 36"W × 78"H) | Brass or brushed gold metal frame, beveled mirror glass | 1 | $400–$700 | $400–$700 | **Furniture Subtotal: $8,750–$12,300** --- ## LIGHTING | Item | Description | Dimensions | Material/Finish | Qty | Est. Price/Unit | Total | |------|-------------|------------|-----------------|-----|-----------------|-------| | **Floor Lamp (Lounge)** | Arc or tripod floor lamp with linen shade (cream/warm white). Brass or brushed gold stem. Dimmer switch compatible. 3-way bulb option. | Shade 18"Dia. × 12"H; total height 62–68" | Brass or brushed gold metal, linen shade | 1 | $450–$700 | $450–$700 | | **Bedside Sconce** (2×) | Wall-mounted reading sconces with brushed brass arm and fabric shade or integrated LED. Cantilevered or adjustable arm. Dimmer compatible. | 8–10"W × 9–12"H | Brushed brass / fabric shade or integrated LED | 2 | $300–$450 | $600–$900 | | **Desk Task Light** | LED desk lamp, modern form factor. Brushed brass or matte black. Adjustable arm, color temperature control (3000K standard). USB charging port optional. | 12–16"W × 16–20"H | Brushed brass or powder-coated metal, LED | 1 | $200–$350 | $200–$350 | **Lighting Subtotal: $1,250–$1,950** --- ## TEXTILES & WINDOW TREATMENTS | Item | Description | Dimensions | Material/Finish | Qty | Est. Price/Unit | Total | |------|-------------|------------|-----------------|-----|-----------------|-------| | **Blackout Drapery** | Full-height blackout-lined drapes in linen-cotton blend or performance fabric (warm greige, taupe, or soft white). Motorized or manual traversal. Brass or brushed gold rods and finials. | Per window width × floor to ~6" above sill | Linen-cotton blend or performance polyester, motorized track optional | 2 panels per standard window | $600–$1,000/pair (installed) | $1,200–$2,000 | | **Bedding Package** | High-thread-count Egyptian cotton sheets (400+ TC), duvet cover, decorative throw pillows (4–5 pcs), bed runner in complementary neutral tones. Vendor-supplied or coordinated. | King size | 100% Egyptian cotton, high-performance blend | 1 | $800–$1,200 | $800–$1,200 | | **Area Rug** | Wool-blend or performance rug, 8×10 or runner. Neutral palette with subtle texture (loop pile or natural jute inlay). Defines seating area. | 8'×10' or 3'×12' runner | 80% wool / 20% synthetic or jute blend | 1 | $600–$1,000 | $600–$1,000 | **Textiles Subtotal: $2,600–$4,200** --- ## FIXTURES & ACCESSORIES | Item | Description | Dimensions | Material/Finish | Qty | Est. Price/Unit | Total | |------|-------------|------------|-----------------|-----|-----------------|-------| | **Wall Art (Framed Prints/Canvas)** | Contemporary abstract or landscape art (2–3 pieces). Curated for boutique aesthetic. Brass or aluminum frames, or canvas stretchers. | Varied (e.g., 24"×36", 30"×40") | Canvas, framed print / brass or aluminum | 2–3 | $250–$500 | $500–$1,500 | | **Decorative Accessories** | Vases, small sculptures, coffee table books, desk accessories. Brass, ceramic, or natural materials. Curated to style. | Varied | Mixed materials: brass, ceramic, wood, natural fiber | As needed | $50–$200 | $400–$600 | | **Throw Pillows (Accent)** | 2–3 additional accent pillows in complementary textures (linen, velvet, performance fabric). Brass or gold-tone zippers. | 18"×18" or 16"×24" | Linen, velvet, performance fabric / feather or poly fill | 2–3 | $80–$150 | $160–$450 | **Fixtures & Accessories Subtotal: $1,060–$2,550** --- ## SUMMARY | Category | Subtotal Low | Subtotal High | |----------|--------------|---------------| | Furniture | $8,750 | $12,300 | | Lighting | $1,250 | $1,950 | | Textiles | $2,600 | $4,200 | | Fixtures & Accessories | $1,060 | $2,550 | | **TOTAL FF&E (Materials Only)** | **$13,660** | **$21,000** | | Delivery & Installation (est. 8–12%) | $1,100–$2,500 | $1,700–$2,500 | | **TOTAL PROJECT COST** | **$14,760–$16,160** | **$22,700–$23,500** | **Note:** Budget accommodates mid-to-high contract-grade items with allowance for customization (drapery motorization, mini-fridge cabinet fabrication, upholstered headboard specification). Soft goods (bedding, pillows) may be sourced separately from in-house linen vendor if available. Brass and warm metallics consistent throughout for cohesive Contemporary Transitional aesthetic.
# SOURCING STRATEGY & PROCUREMENT NOTES ## VENDOR RECOMMENDATIONS BY CATEGORY ### Furniture (Bed Frame, Nightstands, Lounge Chair, Desk, Mini-Fridge Cabinet) **Primary Tier 1 Vendors:** - **Thrive Furniture** (contract-grade, 8–12 week lead time) – excellent Contemporary Transitional beds and upholstered seating; customizable headboard fabrics and wood finishes. - **Room & Board** (contract division) – walnut and oak casework with clean lines; nightstands and desks; 6–10 week lead time. - **Ethan Allen Contract** – upholstered lounge chairs in performance fabrics; trestle and pedestal desks; 6–8 week lead time. - **Custom Upholstery Partners** (e.g., Cisco Home, Lee Industries) – lounge chair upholstery in performance fabric (Sunbrella, Crypton, etc.); 10–14 week lead time for custom spec. - **Mainstay Industries or JSI Hospitality Casework** – custom mini-fridge cabinets with integrated appliance; 12–16 week lead time; requires cabinet shop coordination with appliance installer. **Trade Resources:** - NeoCon (annual Chicago trade show) – direct manufacturer connections, volume pricing negotiation. - HD Expo / Hospitality Design Expo – contract-grade suppliers with group purchasing rates. - CEDIA / IDS membership – access to wholesale platforms and dropship integration. **Lead Time Alert:** *Order bed frame, mini-fridge cabinet, and lounge chair immediately.* These are critical path items with 10–16 week lead times. Confirm wood finish and upholstery selections with designer 2 weeks before ordering. --- ### Lighting (Floor Lamp, Bedside Sconces, Desk Task Light) **Primary Vendors:** - **Apparatus Studio** or **Apparatus-affiliated showrooms** – contemporary brass lighting with linen shades; hotel-grade durability; 8–12 week lead time. - **Cedar & Moss** – modern floor and wall sconces; brass finishes standard; 6–10 week lead time. - **Visual Comfort (contract division)** – extensive sconce catalog, dimmer compatibility standard, 5–8 week lead time. - **Schoolhouse Electric** – contemporary design, warm finishes, good for desk lamps; 4–6 week lead time. - **Rejuvenation (contract)** – mid-range contemporary, faster lead times (4–6 weeks), good price-to-quality ratio. **Specification Notes:** - All sconces and floor lamps must be compatible with hotel dimmer systems (0–10V or leading-edge dimmer). Confirm with electrical drawings early. - Bedside sconces: favor swivel or adjustable arms for guest reading comfort; cantilevered style preferred to avoid nightstand clutter. - Desk task light: specify LED with adjustable color temperature (3000K recommended for warm hospitality aesthetic). **Lead Time:** Order sconces concurrently with furniture; 8–12 week lead time. --- ### Window Treatments (Blackout Drapery) **Primary Vendors:** - **Hunter Douglas (contract)** – motorized blackout roller shades or Roman shades; integrated tracks; 8–10 week lead time; excellent for large hotel projects with volume discounts. - **Lutron Sivoia (motorized track systems)** – premium motorized drapery; integrates with room control systems; 10–14 week lead time. - **Custom Drapery Fabricators** (local or regional): - **Kravet Contract** – performance fabrics, blackout linings, custom fabrication; 8–12 week lead time. - **Clarence House** – luxury linens with inherent blackout; 10–12 week lead time. - **Fabricut** – mid-range contract textiles, faster turnaround (6–8 weeks). - **Local upholstery/drapery shop** – coordinate for hanging, rod installation, and hem finishing on-site; factor in 2–3 weeks for fabrication + installation. **Specification Considerations:** - Confirm room window dimensions and sill-to-ceiling height before ordering; custom lengths required. - Motorization: if specified, coordinate with electrical scope and building automation system early (4–6 week lead time buffer). - Brass rods and finials: source from **Rod Desyne**, **Swish**, or **custom fabricators** (usually included with drapery vendor). - Blackout liner requirement: specify 100% room-darkening; thermal and acoustic benefits secondary. **Lead Time Alert:** Order drapery as soon as window dimensions confirmed; critical for installation sequencing (typically one of last items hung, after walls finalized). --- ### Textiles (Bedding, Area Rug, Accent Pillows) **Recommended Vendors:** - **Bedding:** Coordinated through hospitality linen supplier or direct from **Frette**, **Anichini**, or **Peacock Alley** (wholesale). 4–6 week lead time. - **Area Rug:** - **Armadillo & Co.** – performance jute, wool blends, 8×10 standard stock available; 2–4 week lead time. - **Rug USA (contract)** – custom sizing, wool-blend options; 4–8 week lead time. - **Merida (contract rugs)** – sustainable jute/wool, good for boutique aesthetic; 6–10 week lead time. - **Accent Pillows:** coordinate with upholstery vendor or source from **Ethan Allen**, **Kravet Contract Pillows**, or custom seamstress. 4–6 week lead time for custom covers. --- ## PROCUREMENT STRATEGY **Phase 1 (Weeks 1–2): Long-Lead Orders** 1. Place bed frame order (spec headboard fabric, wood finish). 2. Place mini-fridge cabinet order (coordinate fridge appliance specs with GC/MEP). 3. Place lounge chair upholstery order (performance fabric selection). 4. Submit window dimensions to drapery vendor; place motorization order if applicable. 5. Confirm lighting selections and place sconce orders (dimmer compatibility verification). **Phase 2 (Weeks 3–4): Secondary Orders** 1. Place nightstand, desk, desk chair orders. 2. Order area rug (coordinate size with floor plan). 3. Order floor lamp and task lighting. 4. Finalize bedding, throw pillows, wall art selections. **Phase 3 (Weeks 8–10): Final Coordination** 1. Confirm all delivery dates with GC/project manager. 2. Coordinate drapery installation scheduling (typically 2–3 weeks before final handoff). 3. Confirm mirror installation (wall prep/hardware). 4. Review accessories and styling plan with designer. **Phase 4 (Weeks 14–16): Installation & Handoff** 1. Coordinate staggered delivery to avoid on-site storage issues. 2. Schedule furniture assembly and positioning. 3. Install drapery, mirrors, sconces, lighting. 4. Final styling and accessory placement. 5. Quality assurance walk-through. --- ## INSTALLATION & DELIVERY CONSIDERATIONS **Delivery Logistics:** - **Furniture:** Most vendors offer white-glove delivery and basic assembly (bed frame, nightstands) for additional fee (~$150–$300/room). Coordinate with GC for site access and elevator usage. - **Drapery:** Typically installed by custom fabricator crew or separate installer (2–3 days). Confirm rod installation and bracket placement prior to delivery. - **Lighting:** Sconces and wall fixtures require electrician; schedule coordination with MEP contractor. Budget 1–2 hours per room for installation. - **Mini-Fridge Cabinet:** Requires GC coordination for appliance hookup (electrical, ventilation). Cabinet typically arrives finished; minor on-site assembly if leg-mounted. **Site Conditions:** - Confirm flooring completion before area rug delivery (rug cannot be laid on unfinished floors). - Wall finishes must be complete before mirror and sconce installation. - HVAC operational before mini-fridge placement (temperature stability for appliance). --- ## CUSTOM FABRICATION ITEMS (Lead Time & Budget Implications) 1. **Bed Headboard (Upholstered):** 8–10 week lead time; $600–$1,000 upcharge for custom fabric selection. Source headboard separately if bed frame vendor lacks customization. 2. **Mini-Fridge Cabinet:** 12–16 week lead time (longest single item). Requires detailed spec: fridge type, dimensions, finish match to nightstands, soft-close mechanism, electrical outlet placement. Consider building on 10–week timeline; order immediately. 3. **Custom Drapery:** Fabrication + motorization + hardware = 10–14 week lead time. Confirm window measurements by Week 1. 4. **Area Rug (Custom Dimensions):** 8–10 week lead time if non-standard size (e.g., runner for narrow space). --- ## BUDGET & VALUE ENGINEERING **If overbudget ($21K–$22K ceiling):** - Downgrade lounge chair upholstery to standard performance fabric (no custom nailhead embellishment): save $200–$400. - Specify wall-mounted sconces over floor lamp; more cost-effective: save $200–$300. - Reduce wall art from 3 pieces to 2 or use canvas prints vs. framed prints: save $300–$500. - Specify motorized roller shades instead of custom drapery track: save $400–$800 (faster lead time, simpler installation). - Source area rug in-stock standard size vs. custom: save $200–$300. **If underbudget (under $14K):** - Upgrade bed frame to higher-end platform with integrated storage headboard: +$500–$1,000. - Add motorization to drapery: +$600–$1,000. - Upgrade lounge chair to designer collection (e.g., Hans Wegner, Florence Knoll reproduction): +$600–$1,200. - Commission local artist wall installation: +$400–$800. --- ## CRITICAL TIMELINE SUMMARY | Milestone | Week | Action | |-----------|------|--------| | **Design Finalization** | 1 | Confirm all finish selections, dimensions, material specs. | | **Long-Lead Orders (Bed, Mini-Fridge, Lounge Chair, Drapery, Sconces)** | 1–2 | Submit orders; confirm delivery windows (10–16 weeks). | | **Secondary Orders (Nightstands, Desk, Rug, Pillows)** | 3–4 | Place remaining orders (6–10 week lead time). | | **Window Preparation** | 5–6 | Confirm wall prep, rod bracket installation, electrical for motorization. | | **Furniture & Rug Arrivals** | 10–12 | Begin receiving shipments; coordinate GC for placement. | | **Drapery Installation** | 12–13 | Schedule 2–3 day installation window; finalize hardware. | | **Lighting Installation** | 13–14 | Electrician installs sconces, floor lamp; dimmer testing. | | **Final Accessorizing & QA** | 15–16 | Styling, artwork hanging, mirror installation, final walk-through. | | **Guest Handoff** | 16 | Room ready for service. | --- ## VENDOR CONTACT & ACCOUNT MANAGEMENT - **Designate single FF&E coordinator** to manage all orders, delivery dates, and spec changes. - **Establish net-60 to net-90 payment terms** with primary vendors (standard for contract projects). - **Request volume discount** on orders >5 rooms; negotiate 10–15% off suggested retail for multi-room projects. - **Confirm drop-ship and fixture integration** early with MEP/GC to avoid site coordination conflicts. - **Weekly status calls** with GC and top 3 vendors (bed, drapery, lighting) during Weeks 8–16 to confirm delivery sequencing.
Swap in your actual project name, room dimensions, and item list, then adjust the style descriptor and budget range to match your contract. Review every unit price against your current vendor quotes before sharing with a client or ownership group.
Human review: All unit prices and lead times are estimates only — verify against live vendor quotes before submitting to a client, owner, or procurement team.
Generate this for your own situation — free.
5 runs a day, no credit card.
Try the FF&E Specification Sheet Generator